Job site installation and earth moving
Completion requirements
For water supply network excavation is the most expensive part of pipe laying, the selection of trench dimension and its positioning is made by the topographic surveyor, he is a key player to refers all excavations, its coordinates and its altitudes. Now day it is conducted using an electronic distance metering (EDM).
Excavation can be made by hand in case of confined space but it is mainly mechanized.